Get the free app

For Electricians

Electrical rough-in photos, before the drywall closes

Electrical work has a hard deadline that no other trade has: the day drywall goes up, everything you installed becomes invisible. Every home run, box height, and staple is behind a wall until someone cuts it open. A rough-in photo set is the difference between knowing where a circuit runs and guessing.

Free during early access — no credit card required.

What Gets Photographed

What electrical crews document

The shots worth taking, and why each one matters later.

Rough-in before drywall

Wall-by-wall coverage of home runs, box placement, staples and drill points, shot before the wall closes.

Panel and subpanel

The panel open with the schedule legible, so circuit numbering is on record and not just on a sticker that fades.

Service and grounding

Meter base, service entry, ground rods and bonding — the parts inspectors always come back to.

Inspection sign-offs

Rough and final inspection tickets photographed with the job, not left in a truck.

Device counts by room

Receptacles, switches and fixtures per room, which settles change-order questions about what was actually installed.

Trim-out and finished work

Final devices, plate alignment and fixture installs at completion.

Proof On File

The arguments this record settles

Every one of these comes down to whether a dated photo exists.

  • A plumber's screw hits a cable and the rough-in photo shows exactly where your wire ran.
  • The owner insists more can lights were in scope — the rough-in count says otherwise.
  • A remodel two years later needs to know what's behind a wall, and you can pull the photo in seconds.
  • An inspector questions grounding that was already buried, and you have it dated and photographed.
What It Looks Like

A day on a electrical job, on the record

The same two artefacts every project builds up: what happened today, and what still needs fixing.

A daily log from this trade

Second floor rough-in complete

All bedroom and hall circuits pulled and stapled. Boxes set at 16in, switches at 48in. Home runs labeled at panel — schedule photographed. Two extra receptacles added in the primary bedroom at owner request, noted for change order.

Crew members post updates with photos straight from the field, so the entry lands on the day the work happened.

Punch items that come up

  • Missing blank plate — hall junction box
  • Reverse polarity at kitchen island receptacle
  • Label subpanel circuits 12 through 18

Each item carries before and after photos, so completion is visible without another walkthrough.

FAQ

Questions from Electricians

Your Next Job

Start documenting your next job

Turn the photos your crew already takes into a record you can hand to a client, an adjuster, or a judge.